Technical Library

Installation Guides

Step-by-step guides for installing Mission RTUs in the field. Each guide covers site preparation, wiring, antenna placement, cellular provisioning, sensor configuration, and 123SCADA portal setup. Written for the field technician who is on-site with the equipment and needs clear, sequential instructions.

Every guide covers
  • Site preparation
  • Wiring
  • Antenna placement
  • Cellular provisioning
  • Sensor configuration
  • 123SCADA portal setup
MyLevel

Installing a MyLevel?

The MyLevel install is on video, step by step: unboxing, sensor mounting, antenna, depth settings, and 123SCADA configuration. The sensor selection reference is in Documentation.

MyLevel sewer level monitor

Get Started

Join 4,000+ utilities that trust Mission Communications for managed SCADA. Request a personalized demo and see 123SCADA in action — with your data, your sites, and your specific monitoring needs.